Second Story Additions Toronto
If you love your existing home but require more space, Novacon Construction has a solution for you: add a second floor to your home. Novacon Construction is a Toronto design-build company that has designed and built second-storey additions since 2004. We handle the structural assessment, architectural and structural drawings, zoning review, City of Toronto permits and construction under one team, and we are a Best of Houzz 2025 award recipient.
Our second-story addition services are ideal for those in the Toronto area looking to enhance their homes without compromising on quality or style. We understand the nuances and complexities of building upwards, ensuring that your second-floor addition seamlessly integrates with the original structure. Choose us for your home extension and watch as we shape your vision into a stunning reality.
Second-Storey Additions in Toronto at a Glance
- Who we are: a licensed, bonded and insured Toronto design-build company based in Scarborough, building major additions since 2004, with over 500 projects completed. Best of Houzz 2025 award recipient.
- A boutique builder: we take on a limited number of major projects each year, typically 6 to 10, so we can give each one the attention it needs from planning to handover.
- Firm fixed price: every Novacon contract is firm fixed price, so you know your construction cost before work begins.
- Best suited to: bungalows and ranch homes that need more bedroom space, and homes on smaller Toronto lots where lot coverage is maxed out or the rear yard is worth keeping. On older semi-detached homes we often combine a rear main-floor addition with a second-floor primary suite.
- It starts with a structural assessment: an engineer reviews the existing walls, foundation and floor structure before design begins, so any reinforcement or underpinning is known up front.
- Typical 2026 construction cost (before HST): $450 to $650 per sq. ft.; a 700 to 800 sq. ft. second storey commonly runs $315,000 to $520,000 in construction cost. See the full cost guide.
- Typical timeline: about 8 to 14 months from the start of design to completion, with a meaningful share of that in design and permits. A Committee of Adjustment minor variance, if needed, adds 3 to 4 months.
- Zoning: building height, floor space index (FSI) and angular plane rules decide how large the new floor can be. We confirm these for your lot before design.
- Living arrangements: the existing roof comes off, so most families plan to live elsewhere for at least the most intensive phase of construction. We plan this with you at the start.
- One team: structural engineering, architectural and interior design, permits, inspections and construction, with a dedicated project manager, $5 million liability insurance, WSIB coverage and a 2-year warranty.
Last updated October 2026.







